Ligne 126 : |
Ligne 126 : |
| | | |
| == Mission 1 == | | == Mission 1 == |
− | description of mission1.
| + | The team must build a CanSat and program it to accomplish the primary (madatory) mission, as follows: |
| + | |
| + | After release and during descent, |
| + | * the CanSat shall measure several parameters, |
| + | * the data shoudld be transmitted as telemetry information to the ground station. |
| + | * the telemetry should, at least, be send once every second. |
| + | |
| + | * Air temperature |
| + | * Air pressure |
| + | |
| + | It must be possible for the team to analyse the data obtained (for example, make a calculation of altitude) and display it in graphs (for example, altitude vs. time and temperature vs. altitude). |
| | | |
| {{ttuto-begin}} | | {{ttuto-begin}} |