Modifications

Sauter à la navigation Sauter à la recherche
Aucun changement de taille ,  7 juin 2022 à 14:11
aucun résumé de modification
Ligne 9 : Ligne 9 :     
There are two mains sections:
 
There are two mains sections:
1. Assembling the '''Base''' board and '''Prototyping''' with the ribbon is an exciting moment... so the first described<br />Anyway, don't forget to solder perform the soldering tasks prior to attach the ribbon.  
+
1. Soldering the required items on the boards.
2. Soldering the required items on the boards.
+
2. Assembling the '''Base''' board and '''Prototyping''' with the ribbon is an exciting moment... so the first described<br />Anyway, don't forget to solder perform the soldering tasks prior to attach the ribbon.  
 
  −
== Attaching the boards together ==
  −
You are certainly impatient to attach the boards together with the ribbon. '''If''' the required components are already soldered on the boards '''then''' everything is ready to attach them '''otherwise''' browse down this page to locate the required soldering tasks.
  −
 
  −
{{traduction}}
      
== Raspberry-Pi Pico Soldering ==
 
== Raspberry-Pi Pico Soldering ==
Ligne 199 : Ligne 194 :  
|}
 
|}
    +
 +
== Attaching the boards together ==
 +
You are certainly impatient to attach the boards together with the ribbon. '''If''' the required components are already soldered on the boards '''then''' everything is ready to attach them '''otherwise''' browse down this page to locate the required soldering tasks.
 +
 +
{{traduction}}
    
{{ENG-CANSAT-PICO-TRAILER}}
 
{{ENG-CANSAT-PICO-TRAILER}}
29 917

modifications

Menu de navigation